E-Way Bill Rules: Distance Slabs and Common Slip-Ups

When you need an e-way bill, how long it stays valid, and the small mistakes that cause a truck to sit at a checkpost for a day.

UrbanKhata Editorial Team
Updated · 5 min read
On this page

An e-way bill is a document the transporter must carry when goods above a certain value are moved from one place to another. The rules look simple, but the small print (distance slabs, part-A vs part-B, cancellation windows) is what causes trucks to sit at check posts.

When it is required

An e-way bill is required for the movement of goods when the consignment value exceeds Rs 50,000. The value threshold is per consignment, not per invoice. If a single vehicle carries multiple consignments where each is under Rs 50,000 but the total is above, a consolidated e-way bill (EWB-02) is required.

Certain goods are exempt regardless of value: LPG for household use, kerosene for PDS, used personal and household effects, gems and jewellery, and a specific notified list.

Validity by distance

Validity is a function of distance and vehicle type. For a regular cargo vehicle, one day of validity per 200 km or part thereof. For an over-dimensional cargo vehicle, one day per 20 km. Distance is measured on the shortest route, not the actual route taken.

  • Up to 200 km: 1 day
  • 201 to 400 km: 2 days
  • 401 to 600 km: 3 days
  • For every additional 200 km or part: 1 additional day

Part A and Part B

Part A carries invoice details (GSTIN of supplier and recipient, value, HSN, place of dispatch and delivery). Part B carries vehicle number and transporter details. You can generate the e-way bill with only Part A and let the transporter fill Part B before movement, but the bill is not valid for movement until Part B is filled.

A common mistake: dispatching a truck with only Part A filed. If it is stopped, the goods can be detained until the vehicle number is added.

Cancellation and rejection

The generator can cancel an e-way bill within 24 hours of generation, provided the goods have not yet moved. The recipient can reject a bill within 72 hours if the goods were not received. After the window closes, the fix is a credit note, not a cancellation.

Frequently asked questions

Can I generate an e-way bill for a job-work delivery to my own facility in another state?

Yes. Movement of goods for reasons other than sale (job work, own use, exhibition, sales return) is covered. The reason code is different and the "consignor is also consignee" condition is handled by the system.

What is the penalty for moving goods without an e-way bill?

The higher of Rs 10,000 or the amount of tax evaded. Goods and the vehicle can be detained and released only on payment of the tax and penalty.

Written by the UrbanKhata Editorial Team

We build GST billing and accounting software for Indian businesses and write about the rules we implement every day. Thresholds and rates are checked against CBIC and Income Tax guidance as of the update date above. For decisions specific to your business, confirm with your CA.

Keep reading

All articles

GST invoices, returns and books, in one place.

UrbanKhata turns every invoice into GSTR-1 data, ledger entries and a live P&L. Start on the free plan and add your CA when you're ready.